Tired of ads? Enjoy an ad-free experience by signing up.
👩‍🍳 How we use AI at Tech in Asia, thoughtfully and responsibly.
🧔‍♂️ A friendly human may check it before it goes live. More news here

XAI seeks permit to build power plant for data centers

Elon Musk’s xAI, an AI firm, is seeking permission to build a natural-gas power plant in Southaven, Mississippi, to supply nearby data centers, and the state environmental agency set a permit-board meeting for the morning of the 2026 primary election in Jackson.

In a March 8 letter, the NAACP and other advocates asked regulators to delay and move the meeting, saying the date and location would prevent local residents from attending and could interfere with voting.

The Mississippi Department of Environmental Quality denied the request and said its permit board meets on the second Tuesday of each month and handles matters statewide.

Residents have complained of round‑the‑clock noise and air quality problems linked to temporary gas turbines used by xAI in Southaven and earlier in Memphis.

Research by scientists at the University of Tennessee found the turbines added to air pollution in Greater Memphis, and an investigation by Floodlight found xAI operated more than a dozen “temporary” turbines concurrently in Southaven.

In February, the NAACP filed a notice of intent to sue over alleged Clean Air Act violations, and the permit-board meeting will decide whether the Mississippi Department of Environmental Quality will grant the key permits the company needs to build the power plant.

🔗 Source: CNBC

🧠 Food for thought

Implications, context, and why it matters.

xAI repeats a controversial build first, permit later strategy

  • The Southaven fight fits a pattern set at xAI’s first data center, “Colossus 1,” in Memphis, Tennessee 1.
  • In Memphis, xAI put in as many as 35 gas turbines without permits. It applied only after a Clean Air Act notice of intent to sue was filed on behalf of the NAACP. xAI later secured permits for its remaining 15 turbines 1.
  • In Southaven, xAI runs 27 gas turbines without permits. Mississippi regulators label them “temporary-mobile” engines, which can avoid permitting for up to one year 2.
  • xAI is also applying for permits for 41 permanent turbines with about 1.2 gigawatts of capacity, which is more than half the maximum output of the Hoover Dam 2.

AI’s power demand is fueling a new kind of industrial conflict

  • This dispute captures a choke point for AI. Demand for electricity can outpace what the public grid can deliver, so companies add on-site generation 3.
  • Companies such as xAI can build private “behind-the-meter” power plants, facilities that generate electricity on the customer’s side of the utility meter. That setup lets them add computing power without waiting for utility-scale upgrades 2.
  • The rush can trigger local backlash over noise, pollution, and health effects. The tension often lands hardest in places already carrying environmental burdens 1.
  • A study commissioned by environmental advocates estimated the proposed permanent plant could drive up to $44 million a year in health damages from pollution 2.

Recent xAI developments

Stay ahead in Asia’s tech landscape

You've reached your 2 free content limit for the month. Sign up for free to read the full story.

🏄 For casual readers / 👶 Free

Basic

US$0

Free forever

Get instant access to this article and more every month

0 premium content

Unlimited news briefs

5

5 articles

Ad-free reading experience

Just US$0 per day

⌛Sign up in 20s. No payment details needed.

📖 For learners / 👍 Starter

Lite

US$4.92/month

Billed annually at US$59/year

Get instant access to this article and more every month

4

4 premium content

Unlimited news briefs & articles

Ad-free reading experience

Just US$0.17 per day

Cancel anytime

Our subscriber community includes professionals from these companies:

Stay updated on the go with our mobile app.

Get latest insights with smoother, more personalized experience through TIA mobile app.