🧔♂️ A friendly human may check it before it goes live. More news here
Sam Altman steps down from Helion Energy board
Sam Altman has stepped down from the board of Helion Energy, a fusion startup he has backed since 2015, as Helion and OpenAI explore working together at “significant scale,” he said on X.
Altman said his roles had become incompatible as OpenAI considers future partnerships with Helion, and added he will keep a financial interest in the company while recusing himself from any deal talks.
OpenAI is in advanced discussions to buy electricity from Helion, with talks centering on an initial 12.5% share of output and power equivalent to 5 gigawatts by 2030, rising to 50 gigawatts by 2035, Axios reported, citing a person familiar with the matter.
Helion said it has not announced any new customers beyond previously disclosed deals with Microsoft and Nucor, and the company has raised over US$1 billion, including a US$425 million series F in January 2025, valuing it at US$5.4 billion.
🔗 Source: Reuters
🧠 Food for thought
Implications, context, and why it matters.
Helion’s concrete plans are far smaller than OpenAI’s goals
- Helion has shared a power purchase agreement (PPA) with Microsoft, which is a long-term electricity buying contract, for power from its first fusion plant set for 2028 1.
- That first site, Orion, includes financial penalties if Helion misses its delivery commitment 2.
- A 5-gigawatt OpenAI target by 2030 would be 100 times Helion’s 50-megawatt promise to Microsoft 1.
- That scale would arrive before Helion clears a technical bar since it has not produced more energy than its fusion reactions use 3.
- Helion expects its seventh prototype, Polaris, to generate electricity in 2024 1.
AI’s energy crunch is pushing a hunt for moonshot power sources
- The potential OpenAI deal answers rising AI power needs that are stretching current infrastructure 4.
- U.S. data centers could reach 426 terawatt-hours of electricity use by 2030, which is more than double 2024 levels, driven largely by AI 5.
- Sam Altman has reportedly said his AI plans require 250 gigawatts of new power by 2033, which experts call almost inconceivable with today’s grids 6.
- Traditional generation cannot expand fast enough, so large tech firms are backing high-risk options such as fusion to keep growth on track 4.
- Microsoft has also pursued conventional nuclear power and signed long-term PPAs for large volumes of carbon-free electricity starting in 2028 7.
Stay updated on the go with our mobile app.
Get latest insights with smoother, more personalized experience through TIA mobile app.




