Tired of ads? Enjoy an ad-free experience by signing up.
👩‍🍳 How we use AI at Tech in Asia, thoughtfully and responsibly.
🧔‍♂️ A friendly human may check it before it goes live. More news here

Meta, US asset manager Blue Owl partner on $27b AI data center

Meta and funds managed by Blue Owl Capital have formed a joint venture to finance, develop, and operate the Hyperion data center campus in Richland Parish, Louisiana.

Funds managed by Blue Owl Capital, a US-based alternative asset manager, will own an 80% interest in the venture, while Meta retains 20%.

This partnership was designed to support the speed and flexibility required for Meta’s data center projects and long-term AI ambitions.

Both parties will fund their share of the campus’s estimated US$27 billion development costs, which cover buildings and infrastructure for power, cooling, and connectivity.

Meta contributed land and construction assets to the joint venture, while Blue Owl’s funds made a cash contribution of about US$7 billion.

Meta received a one-time distribution of around US$3 billion from the joint venture.

Once construction is complete, Meta will lease all facilities at the campus under a four-year term with extension options.

🔗 Source: Meta

🧠 Food for thought

Implications, context, and why it matters.

  • Meta holds 20% of the JV, with four-year operating leases plus a 16-year residual value guarantee (capped payment commitment tied to future campus value if leases are not renewed) that limit risk.
  • Entergy (the regional electric utility) targets a 100-mile 500 kilovolt (kV) line by December 2026, with three gas-fired units (new natural gas power plants) online in 2028–2029 12.
  • The timing gap puts $7 billion from Blue Owl into infrastructure before power goes live, which shifts execution risk to the JV while Meta keeps the option to exit through initial terms.
  • Environmental groups filed motions over gas plant approvals, which creates cost and permitting risk despite the $1.2 billion transmission spend 1.
  • Richland Parish sits 30 miles east of Monroe in Louisiana, a small data center state where Lumen (a national fiber carrier formerly known as CenturyLink), AT&T and Zayo (a wholesale fiber network operator) run fiber 23.
  • The 2 gigawatt (GW) Hyperion campus could expand to 5GW and will need long-haul plus metro links plus cloud on-ramps (direct private connections into cloud providers) that may exceed regional capacity, opening room for builds 143.
  • Route builds can link Richland Parish to New Orleans’ neutral exchange point (a carrier-agnostic internet meet-me location) plus submarine cable landings in Texas, Mississippi and Florida to deliver links 3.
  • Meta leases the campus from a JV where it holds a minority stake and providers delivering redundant paths into national backbones could win tenancy (an early, multi-year customer commitment).

Recent Meta developments

Stay ahead in Asia’s tech landscape

You've reached your 2 free content limit for the month. Sign up for free to read the full story.

🏄 For casual readers / 👶 Free

Basic

US$0

Free forever

Get instant access to this article and more every month

0 premium content

Unlimited news briefs

5

5 articles

Ad-free reading experience

Just US$0 per day

⌛Sign up in 20s. No payment details needed.

📖 For learners / 👍 Starter

Lite

US$4.92/month

Billed annually at US$59/year

Get instant access to this article and more every month

4

4 premium content

Unlimited news briefs & articles

Ad-free reading experience

Just US$0.17 per day

Cancel anytime

Our subscriber community includes professionals from these companies:

Stay updated on the go with our mobile app.

Get latest insights with smoother, more personalized experience through TIA mobile app.