Tired of ads? Enjoy an ad-free experience by signing up.
👩‍🍳 How we use AI at Tech in Asia, thoughtfully and responsibly.
🧔‍♂️ A friendly human may check it before it goes live. More news here

AI boom transforms Malaysia’s palm oil estates into data centers

Malaysia’s major palm oil producers are shifting land use to build data center parks and solar farms as the country attracts global tech investment.

Firms such as SD Guthrie, Kuala Lumpur Kepong (KLK), and IOI Corporation, which control some of Malaysia’s largest land holdings, are reserving thousands of hectares for these projects.

Malaysia is seeing rapid growth in data center development, with US$34 billion in investments over four years, including large commitments from Google, Microsoft, and Amazon.

The government aims to establish 81 data centers by 2035, partly driven by Singapore’s moratorium on new facilities.

SD Guthrie plans to build solar farms and industrial parks, targeting one gigawatt of solar capacity within three years.

KLK has launched a 1,500-acre tech park with BYD as an anchor tenant, and plans a second site in Johor.

Analysts and environmental groups caution that solar projects alone may not significantly shift palm oil companies’ overall environmental impact.

🔗 Source: Bloomberg

🧠 Food for thought

Implications, context, and why it matters.

Power sets Malaysia’s data center pace

  • Digital Halo secured a 150MW supply deal with Tenaga Nasional Berhad (TNB), Malaysia’s utility and grid operator, for its JHB1 data center in Johor; the Green Lane Pathway plus One-Stop Centre (OSC) cut the wait to about 12 months from 36–48 1. A lightning strike at the 2,242MW Edra Melaka plant caused outages in Klang Valley and Johor; a halt at the 1,000MW Tanjung Bin Energy unit followed; the two sites equal about 13% of Peninsular capacity 2.
  • TNB plans RM16.3 billion in contingent capital spending under Regulatory Period 4 (RP4) for grid upgrades 2. Analysts want faster new generation projects 2. Palm oil groups hold land banks, yet parks hinge on TNB delivering stable, high-capacity connections in Johor and Selangor (the state that includes greater Kuala Lumpur) where rapid builds could strain systems 3.

Connectivity firms tap Johor cross-border fiber

  • Extreme Broadband and Open DC (a Malaysian data center-network operator) offer managed dark fiber using dedicated unlit strands with support 4. Links span JB1, JB2 carrier-neutral data centers in Johor Bahru to the Johor–Singapore Causeway midpoint, the main border crossing 4. JBIX (Johor Bahru Internet Exchange) offers peering where Google, Facebook connect 4.
  • Phase 1 of the Digital Superhighway Network, an intercity backbone, is live with speeds up to 800 Gbps per fiber pair across 1,063 km linking Johor Bahru with other peninsular data center hubs 4. The Johor-Singapore Special Economic Zone, a bilateral pact signed Jan 7, 2025, seeks cross-border goods flows and business ecosystems that position Johor as overflow for Singapore’s land-constrained market 5.

Stay ahead in Asia’s tech landscape

You've reached your 2 free content limit for the month. Sign up for free to read the full story.

🏄 For casual readers / 👶 Free

Basic

US$0

Free forever

Get instant access to this article and more every month

0 premium content

Unlimited news briefs

5

5 articles

Ad-free reading experience

Just US$0 per day

⌛Sign up in 20s. No payment details needed.

📖 For learners / 👍 Starter

Lite

US$4.92/month

Billed annually at US$59/year

Get instant access to this article and more every month

4

4 premium content

Unlimited news briefs & articles

Ad-free reading experience

Just US$0.17 per day

Cancel anytime

Our subscriber community includes professionals from these companies:

Stay updated on the go with our mobile app.

Get latest insights with smoother, more personalized experience through TIA mobile app.