Tired of ads? Enjoy an ad-free experience by signing up.
👩‍🍳 How we use AI at Tech in Asia, thoughtfully and responsibly.
🧔‍♂️ A friendly human may check it before it goes live. More news here

Lenovo, Nvidia launch AI cloud gigafactory

Lenovo and Nvidia have unveiled a new program aimed at building gigawatt-scale AI cloud infrastructure, announced at CES 2026 in Las Vegas.

The initiative, called Lenovo AI Cloud Gigafactory with Nvidia, targets enterprise and cloud providers seeking to deploy large-scale AI workloads more efficiently.

Lenovo said the program will use Nvidia’s advanced computing platforms and its own liquid-cooling technology to help providers set up AI factories capable of supporting complex applications.

The platform includes access to Nvidia’s Blackwell Ultra architecture, and the newly announced Vera Rubin NVL72 system.

The program is designed to cut deployment time for AI infrastructure, and features integrated solutions spanning hardware, networking, and support services.

Lenovo claims its AI cloud solutions serve eight of the world’s top 10 public cloud providers, and that it can design, manufacture, and integrate custom AI cloud systems in-house.

🔗 Source: Lenovo

🧠 Food for thought

Implications, context, and why it matters.

Lenovo AI factory plan lacks firm buyers, clear dates

  • Lenovo announced the AI Cloud Gigafactory with no firm customer commitments, pilots, or delivery schedules for the NVIDIA-based systems though it powers eight of the top 10 public cloud providers 1.
  • NVIDIA’s Vera Rubin NVL72 has entered production 2, but broader availability is not expected until the second half of 2026 3. Blackwell Ultra systems in the program have no stated ship window, so near-term revenue looks uncertain 1.
  • The announcement omits prices, facility specs or power needs so total cost of ownership cannot be assessed 1. Morgan Stanley pegs liquid-cooling parts for a GB300 (Blackwell Ultra) NVL72 rack at about $49,860 4, which is one slice of spend for gigawatt-scale rollout.

Build liquid-cooling capacity for Rubin systems

  • Data center operators plus colocation providers (data centers that lease space, power, cooling to customers) should ready sites for direct liquid cooling (coolant delivered via cold plates directly to chips) 25. The Vera Rubin NVL72 needs warm-water single-phase cooling with a tubeless, cableless design.
  • Utilities plus power infrastructure firms can stand out with rack-level power smoothing and site-level battery energy storage solutions, since Rubin’s variable AI workloads push power swings that strain utilization 5.
  • Cooling vendors should design gear for the 3,600W thermal design power (the heat a chip is designed to dissipate) of future Rubin Ultra GPUs 4. Standard liquid cooling may fall short, so immersion cooling (submerging hardware in non-conductive fluid) or embedded cooling could handle these loads.

Recent Lenovo developments

Stay ahead in Asia’s tech landscape

You've reached your 2 free content limit for the month. Sign up for free to read the full story.

🏄 For casual readers / 👶 Free

Basic

US$0

Free forever

Get instant access to this article and more every month

0 premium content

Unlimited news briefs

5

5 articles

Ad-free reading experience

Just US$0 per day

⌛Sign up in 20s. No payment details needed.

📖 For learners / 👍 Starter

Lite

US$4.92/month

Billed annually at US$59/year

Get instant access to this article and more every month

4

4 premium content

Unlimited news briefs & articles

Ad-free reading experience

Just US$0.17 per day

Cancel anytime

Our subscriber community includes professionals from these companies:

Stay updated on the go with our mobile app.

Get latest insights with smoother, more personalized experience through TIA mobile app.